Work completed on the Lost Peck Flood Alleviation and Environmental Improvement Scheme
VolkerStevin, working on behalf of Southwark Council, has completed work on the £2.2m Lost Peck Flood Alleviation and Environmental Improvement Scheme in Peckham Rye Park and Common. This scheme is a model of nature-based solutions, integrating natural processes and features to address environmental challenges—in this case, flood risk reduction while enhancing biodiversity and local ecosystems. The team has been working to reduce flood risk to 111 properties in the area of Peckham.
During extreme storm events, large volumes of surface water run down the flowpath of the ‘lost’ River Peck on the common, exposing the area and nearby properties to the risk of flooding. Sections of the common also get naturally wet and boggy during the winter, limiting the use of those sections for sports and recreational purposes.
The team has installed flood bunds to provide flood attenuation with landscaping and land drainage laid throughout the park and common, which will reduce the amount of surface water run-off.
To help protect the environment during the project, the team worked closely with the Southwark Tree Officer to mitigate all impact on established trees in the common. This was done by selecting innovative temporary trackway systems and carefully planning access routes, with the Southwark Tree Officer’s consultation. They placed 700m of temporary trackway, to protect existing ground, which also reduced vehicle movements to site by 80% when compared with creating a traditional stone haul road.