AMP6 Allonby Water Treatment Works

United Utilities appointed C2V+, a CH2M and VolkerStevin joint venture, as one of four Construction Delivery Partners (CDP) for AMP6. The AMP6 contract is a design and construct framework for the next capital investment period, from 2015 to 2020 and covers the full spectrum of works for both water and wastewater across the North West England geographic area for which United Unities is responsible.

The scope of works at Allonby Water Treatment Works was to improve bathing waters, reduce spills of untreated sewage and improve the quality of the treated wastewater which is returned to the sea. Along with the community, 193 properties benefited from the works. It was confirmed by DEFRA on 8 November 2016 that the works have improved the quality of the bathing water, taking it from ‘poor’ to ‘sufficient’.

The technical stuff:
• Installation of a 212m sewer pipe
• New inlet screens
• Additional septic and humus tanks
• A new buried storage tank which is capable of holding 4,000 baths full of
wastewater
• An upgraded UV plant to accommodate increased flows (from 5.2 l/s to 10 l/s)
• A Flow to Full Treatment inlet pumping station providing additional pre-treatment storage
• Three new manholes on the beach
• A tidal pumping station replacing the existing gravity system: increasing the flow capacity to outfall, pipelines and ancillary structures

Facts and figures

  • Client
    United Utilities
  • Value
    £4.5m
  • Completion Date
    June 2016
  • Award winning project
    Lancashire Sub-Regional Project of the Year 2016
  • Project categories
    Water
+